DRT - 114 Rue Ambroise Croizat, 93200 Saint Denis, Paris, France.
- Employer: Digital Realty
- Contractor: Imogis
- Project Manager: Olivier Juajay
- Area: PODS 120 & 130 - 3100 m2
- Duration: May 2009 - September 2009
- Works Package Value: £376,000.00
- Description of works: Pre-marking of pedestal positions to allow for the installation of CWP’s within the Data Halls prior to the raised floor. Supply & installation of Kingspan FDEB Heavy grade raised flooring with Polyflor SD silver grey factory bonded vinyl finish; adjustable pedestals with bolt-on stringers to suit a 1000mm Finished Floor Height.
Forming of steps at entrances within adjoining corridors.
Supply and installation of 720 heavy grade air grilles with opposed blade dampers.
Apsley - Dolittle Meadows Business Park, Hemel Hempstead, Herts.
- Employer: Hertfordshire County Council
- Contractor: Mace
- Project Manager: Pat Walsh
- Area: 2 floors - 4,000 m2
- Duration: August 2005 - December 2005
- Works Package Value: £200,000.00
- Description of works: CAT B refurbishment of existing Tate and Thorsman medium grade raised flooring to new office areas over 2 floors.
Supply & installation of Kingspan FDEB Heavy grade raised flooring with factory bonded vinyl finishes to Comms & Server Rooms to PSA MOB PF2 PS/SPU specification.
Forming of apertures for electrical outlet boxes and grommets to suit modular desk layouts.
Supply & installation of various floor finishes ranging from Interface carpet, Altro vinyl, Amtico, Bonar matting and Morley stair nosings.
Global Switch - Building II, Nutmeg Lane, East India Dock, London. E14
- Employer: Global Switch
- Contractor: Mitie Technology
- Project Manager: Dave Foy
- Area: 3 areas; Levels 3, 7 & 11 - 1650 m2
- Duration: October 2008 - December 2008
- Works Package Value: £180,000.00
- Description of works: Supply & installation of Kingspan FDEB Heavy Grade raised flooring with Polyflor SD steel grey factory bonded vinyl finishes to Data Halls over 3 phases.
U-Channel bridging detail to perimeters to overcome damp proof membrane.
Installation of free-issue air grilles with dampers.
Nower Hill High School - George V Avenue, Pinner, Middlesex
- Employer: Global Switch
- Contractor: Kier Group
- Project Manager: Tom Cotter
- Area: Second Floor Level - 335 m2
- Duration: July 2009 - August 2009
- Works Package Value: £30,000.00
- Description of works: The works comprised of the supply & installation of Kingspan RMG medium grade raised flooring to Social Study and Office Areas along with FDEB medium grade raised flooring with Armstrong Mandarin factory bonded vinyl to the IT Suites.
Form on site apertures for electrical outlet boxes.
As part of our works package we were appointed to undertake the supply and fitting of Heuga Interface 530 heavy contract carpets in various colours as shown above.
HCC - Robertson & Farnham House, Six Hills Way, Stevenage, Hertfordshire
- Employer: Hertfordshire County Council
- Contractor: Mace
- Project Manager: Pat Walsh
- Area: 2 buildings; ground - second floors - 8,000 m2
- Duration: August 2005 - December 2005
- Works Package value: £750,000.00
- Description of works: CAT B Refurbishment of existing Thorsman medium grade raised flooring to existing office areas 200mm high, Kingspan FDEB Heavy grade raised flooring with Steel Grey factory bonded vinyl finishes to Comms & Server Rooms 200 – 600mm high.
Forming of apertures for electrical outlet boxes and 125mm diameter grommets.
Supply & installation of various floor finishes ranging from Interface carpet, Altro vinyl, Amtico, Bonar matting and Morley stair nosings.
Deutsche Bank - 1, Appold Street, London. EC1.
- Employer: Deutsche Bank.
- Contractor: Como Group Limited
- Project Manager: Bob Cooper
- Area: 2 floors – 4,500 m2
- Duration: January 2009 – June 2009
- Works Package Value: £450,000.00
- Description of works: Supply and installation of Kingspan RMG medium grade raised flooring to PSA MOB PF2 PS/SPU specification complete with snap-on stringers to suit a 300 – 600mm Finished Floor Height. Main dealer floor areas to act as a plenum for air flow. FDEB Heavy grade raised flooring with Polyflor SD Silver Grey vinyl to MER and SER Rooms. Refurbishment of existing Tate Heavy grade raised flooring to MER/1 Comms Room.
Supply & installation of heavy grade air grilles to MER & SER Rooms along with 200mm wide linear grilles to main office and dealer floor areas.
Cold applied tanking complete with bunding to perimeter curtain wall; forming of ramps and steps; forming of apertures for outlet boxes, grommets and air diffusers.
Sansource - Blackstone Road, Huntingdon, Cambridgeshire.
- Employer: Sansource.
- Contractor: Kirton Construction
- Project Manager: Mike Moran
- Area: Ground Floor Comms Room – 177 m2
- Duration: 1 week – February 2009
- Works Package Value: £35,000.00
- Description of works: The works comprised of the supply & installation of Jindao WP Heavy grade raised flooring LG factory bonded anti-static vinyl; bolt-on stringers to BSEN 12825 European Standards. Pedestals are fixed with adhesive and mechanically fixed.
Form steps with anti-slip vinyl finishes and Gradus stair nosing’s; 48mm stainless steel handrails.
600 x 600 x 41mm heavy duty air grilles with opposed blade dampers.
Riverside - Granta Park, Great Abington, Cambridgeshire
- Employer: MEPC.
- Contractor: Mace
- Project Manager: Chris Travers
- Area: Blocks A – C; Ground - – 4700 m2.
- Duration: May 2008 – July 2008
- Works Package Value: £170,000.00
- Description of works: New build CAT A project to supply and install Kingspan REG3 Medium grade steel encapsulated wood core panels with adjustable pedestals to suit 150mm Finished Floor Height to BSEN 12825 European Standards. Pedestals are fixed with adhesive.
23, Savile Row, London. WC2.
- Employer: Stanhope.
- Contractor: Mace
- Project Manager: Paul Cluskey
- Area: Ground – Sixth Floor – 8000 m2
- Duration: July 2008 – September 2008
- Works Package Value: £330,000.00
- Description of works: New Build CAT A Project - Due to the accelerated program we were one of the last trades on site to undertake the supply and installation of Kingspan RMG Medium grade steel encapsulated wood core panels with adjustable pedestals to suit 150mm Finished Floor Height to PSA MOB PF2 PS/SPU Standards. Pedestals are fixed with adhesive.
Redhill Data Centre - Foxborough Park, Redhill. RH1 1AX.
- Employer: Digital Realty.
- Contractor: Electricom
- Project Manager: Ian Watson
- Area: UPS Rooms A & B – 27 m2
- Duration: 1 Week August 2009
- Works Package Value: £8,000.00
- Description of works: Supply and installation of Truespan Medium grade screw down steel encapsulated wood core panels with adjustable pedestals to suit 450mm Finished Floor Height to PSA MOB PF2 PS/SPU Standards. Pedestals are fixed with adhesive and mechanically fixed with 2 Hilti fixings diagonally across the pedestal base.
As part of the scope of works we also supplied pre-fabricated steel steps, 48mm diameter key klamp type handrails and flange grilles for the circulation of air flow within the floor void. The sub floor was prepared and painted with an epoxy crete grey gloss floor sealant which enables low maintenance and easy cleaning.