Installation Only

If you have acquired a raised flooring product and are looking for a specialist to install your purchased product then we shall be happy to supply you with a detailed labour only quotation based upon your requirements. We usually recommend visting site to check the onsite conditions such as the subfloor and general building fabric to ensure it is in no way open to the elements. We recommend that all dirty or wet trades such as dry lining or plastering are carried out prior to the raised flooring commencing so that the finish of the raised flooring system is maintained to its original finish and integrity.

We were originally established as a labour only installation company undertaking works as a certified Kingspan installation specialist after years working directly at Hewetson Floors in the late 1980’s.

With over 50 raised flooring technicians we were appointed to install steel encapsulated wood core products on Kingspan Access Floors secured projects for their contracting division in the southern region of the UK.

Project References

  • Sir Robert McAlpine – Esso Glen, Victoria Street, London. SW1. 50,000 m2. RMG 600 Medium Grade System – 200 - 600mm F.F.H.
  • Interior Plc – Allen Overy, Spital Square, London. EC1. 75,000 m2. RMG 600 Medium Grade System – 150 - 400mm F.F.H.
  • Canary Wharf Management – DS5, Canary Wharf, London. E14. 82,000 m2. RMG 600 Medium Grade System – 200mm F.F.H.
  • Bovis Lend Lease – HQ1, Canary Wharf, London. E14. 30,000 m2. RMG 600 Medium Grade System – 200mm F.F.H.
  • Interior Plc – Deutche Bank Comms Centre, Hayes, Middx. 5,000 m2. Heavy Grade Factory Bonded Vinyl – 600mm F.F.H.
  • Morgan Stanley – 20, Cabot Square, Canary Wharf, London. E14 20,000 m2. RMG 600 Medium Grade System – 300mm F.F.H.
  • Kajima Laing – Daiwa Bank, Wood Street, London. EC2. 25,000 m2. RMG 600 Medium Grade System – 200-400mm F.F.H.
  • Structuretone – Buckingham Palace Road, Victoria, London. SW1. 20,000 m2. RMG 600 Medium Grade System – 100mm F.F.H.
  • Paul Y ITC – H6, Queens Road, Central, Hong Kong. 85,000 m2. Air Plenum Calcium Silicate System – 300mm F.F.H.
  • Citibank – Dorset House, Quarry Bay, Hong Kong. 82,000 m2. Goldbach Norit System – 150mm F.F.H.
  • Worachak – Goverment Housing Bank, Bangkok, Thailand. 25,000 m2. Ram Medium Grade System – 150mm F.F.H.
  • Standard Chartered Bank – New Headquarters, Ayala Tower, Philipinnes. 10,000 m2. Ram Medium Grade System – 150mm F.F.H.